Moraleja Green 8 7
Moraleja Green 6 7
Moraleja Green 2 7
La Moraleja Green 7
La Moraleja Green 7
Moraleja Green 1 7
Moraleja Green 4 7
Shopping centers

Moraleja Green

Client
Kennedy Wilson
Area
25.000 m2
Delivery date
November 2017
Duration
8 months

The objective of the project was to improve the image of the building and the connectivity between the different areas.

The construction activities must be divided into those in the North Building, the connection between buildings and the South Building.

– North Building: outdoor work (painting of facade elements, creation of a new entrance, replacement of existing entrances with emergency exits…) and interior work (remodelling of commercial spaces, replaced dropped ceilings, painting and modifications to the toilet areas).

– Connection between buildings: metal frames were added that provide solar protection, change of flooring and incorporation of recessed floor lighting.

– South Building: remodelling of the green area, expansion of the outdoor area on the roof, setback of the glass facade to the garden and expansion of the terrace and commercial spaces on the 1st floor) and interior work (connection between the first floor and its terrace, remodelling of commercial spaces, floorings and dropped ceiling, and creation of a new entrance from the garden).




In our words

lean2cradlecuadrateimageleanconstructionfachada realizada con el método cradle to cradlematerial passport construcía
https://www.construcia.com/wp-content/uploads/2019/10/construcia-img-nuestras-palabras-defaullt-compressed-1-700x700.jpg



Our news

Árima encarga a Construcía el que será su proyecto estrella de oficinas sostenibles

Árima encarga a Construcía el que será su proyecto estrella de oficinas sostenibles

Innovation

Which countries are leading the change in circular economy?

Which countries are leading the change in circular economy?

Circular economy

Kaizen, el principio de mejora continua aplicado a la construcción

Kaizen, el principio de mejora continua aplicado a la construcción

Innovation

Construcía undertakes the design of Torre D’Ara new co-working space

Construcía undertakes the design of Torre D’Ara new co-working space

Innovation

Healthy workplaces to improve well-being and productivity

Healthy workplaces to improve well-being and productivity

Circular economy

Grupo Construcía and its commitment with SDGs

Grupo Construcía and its commitment with SDGs

Circular economy

Moving towards circular economy and zero waste

Moving towards circular economy and zero waste

Circular economy

A construction that generates positive impact

A construction that generates positive impact

Circular economy

Construction of the future today

Construction of the future today

Circular Construction

Keys to understand the circular economy

Keys to understand the circular economy

Uncategorized

Construcía installs the new offices of Haya Real Estate

Construcía installs the new offices of Haya Real Estate

Circular economy

We’ve opened new offices, ‘circular’ and waste-free

We’ve opened new offices, ‘circular’ and waste-free

Circular economy




You want to know more?

trama-decoration

Subscribe to our newsletter to know more about us