Pioneers in circular construction



We are the pioneers of circular construction. We are promoting a change of model to construction that is sustainable, positive for the ecosystem and for people’s health.
0
KG OF TOTAL MATERIALS
0
KG OF NUTRIENTS
0
KG OF WASTE

THE FIRST BUILDING OF CIRCULAR ECONOMY IN SPAIN

With Gonsi Sócrates Bio-Building we keep advancing in our purpose: create a positive impact in the people, the ecosystem and the society.

 

SEE MORE +

Our news

Pinturas saludables certificadas Cradle to Cradle

Pinturas saludables certificadas Cradle to Cradle

Circular economy

Árima encarga a Construcía el que será su proyecto estrella de oficinas sostenibles

Árima encarga a Construcía el que será su proyecto estrella de oficinas sostenibles

Innovation

Which countries are leading the change in circular economy?

Which countries are leading the change in circular economy?

Circular economy

Kaizen, el principio de mejora continua aplicado a la construcción

Kaizen, el principio de mejora continua aplicado a la construcción

Innovation

Construcía undertakes the design of Torre D’Ara new co-working space

Construcía undertakes the design of Torre D’Ara new co-working space

Innovation

Healthy workplaces to improve well-being and productivity

Healthy workplaces to improve well-being and productivity

Circular economy

Grupo Construcía and its commitment with SDGs

Grupo Construcía and its commitment with SDGs

Circular economy

Moving towards circular economy and zero waste

Moving towards circular economy and zero waste

Circular economy

A construction that generates positive impact

A construction that generates positive impact

Circular economy

Construction of the future today

Construction of the future today

Circular Construction

Keys to understand the circular economy

Keys to understand the circular economy

Uncategorized

Construcía installs the new offices of Haya Real Estate

Construcía installs the new offices of Haya Real Estate

Circular economy

We’ve opened new offices, ‘circular’ and waste-free

We’ve opened new offices, ‘circular’ and waste-free

Circular economy

Projects

1/
Hotels

Hotel W

Thanks to work methodology and planning, the work was delivered one week before the agreed time: – Daily planning with Pull Sessions with the associate suppliers; control of stocks, circulations, waste materials. – Development of a quality control system in the factory and in receiving prior to installation. – Deliveries with zero rework management. – Day and night shifts for minimal interruption of hotel operation.

Client
CIGAHOTELS ESPAÑA, S.L.U
Area
15.759m2
Delivery date
May 2018
Duration
4 moths
mas.png
Industrial

BMW

Our construction of an insulated industrial building, for use as a vehicle dealership and workshop. With the application of Lean2Cradle® methodology detailed planning of the work and an exhaustive selection of the materials was obtained, incorporating the principles of sustainable construction (Cradle to Cradle). Thanks to it the BREEAM certificate  on sustainable construction was obtained.

Client
BMW
Area
17.000m2
Delivery date
november 2017
Duration
14 months
mas.png
Properties

Torre Chamartín

Despite the difficulty of carrying out a project with several companies involved, Construcía led the general coordination and ensured that the work was delivered in the established periods.

Client
Isla Chamartín
Area
15.000m2
Delivery date
February 2018
Duration
12 months
mas.png
Corporate Headquarters

Uría Menéndez

The Project consists of the establishment of offices on 8 floors. As it is very repetitive work, Lean Construction methodology is proposed from the start. In the Pull Sessions with the most important suppliers the target is set of completing each floor in 8 weeks. Thanks to the detailed planning of Lean and the shipping logistics, a large part of the work is done in the shop, thus eliminating on-site downtime and the entire assembly is accelerated.

Client
URÍA MENÉNDEZ
Area
6.000m2
Delivery date
April 2018
Duration
4 months
mas.png
Industrial

Cetec

Reform and new construction of laboratory in the Technological Centre of Técnicas Reunidas, consisting of the renovation of the existing building and new execution of metal structures, frameworks, installations etc. for plant of laboratory. Project of Works of structural renovation of industrial building, whose scope consists of substitution of the support structure of frameworks, substitution of stairs, railings and metal carpentry. Conditioning of electrical installations, air conditioning, etc. The main contractor, in this case Construcía, is in charge of the total coordination of all site tasks.

Client
Técnicas Reunidas
Area
2.500m2
Delivery date
October 2013
Duration
5 months
mas.png
Shopping centers

ABC Serrano

As it is a shopping centre that is open to the public, measures were adopted that were aimed at reducingt he visual and operational impact of the work: –Double day and nightshifts to maximize performance. –Daily communication with the management of the shopping centre and the operators to program the activities weekly by exhaustive planning with all agents involved. –Conscientious protection and cleaning

Client
Zambal Spain Socimi S.A.
Area
29.000 m2
Delivery date
July 2017
Duration
16 months
mas.png
Metodología

Lean2Cradle Construcía®

Nuestro afán por encontrar un modelo de construcción que proteja el entorno y cuide de las personas que habitan los edificios nos llevó a crear la metodología Lean2Cradle Construcía®. Con ella conseguimos reducir los dos principales impactos negativos del sector de la construcción: la toxicidad de los materiales y la creación de residuos.

Methodology

LEAN2CRADLE Construcía®

Our quest to find a model of construction that protects the environment and cares for people who live in the buildings led us to create the Lean2Cradle Construcía® methodology. With it, we are able to ensure reduction of the two main negative impacts of the construction sector: the toxicity of materials and the creation of waste.

Methodology

LEAN2CRADLE® Construcía

Our quest to find a model of construction that protects the environment and cares for people who live in the buildings led us to create the Lean2Cradle® Construcía methodology. With it, we are able to ensure reduction of the two main negative impacts of the construction sector: the toxicity of materials and the creation of waste.

In our words

lean2cradlecuadrateimageleanconstructionfachada realizada con el método cradle to cradlematerial passport construcía
https://www.construcia.com/wp-content/uploads/2019/10/construcia-img-nuestras-palabras-defaullt-compressed-1-700x700.jpg

You want to know more?

trama-decoration

Subscribe to our newsletter to know more about us